Our Work
Explore Our Impressive Site Development and Construction Projects
Welcome to Florida Roads Contracting Inc., where we take immense pride in showcasing our impressive portfolio of site development projects and construction projects. As a leading company in the industry, we have successfully executed numerous ventures that have left a lasting impact on communities and landscapes throughout the region. Step into the world of innovation, precision, and creativity as you explore our diverse range of completed projects.
VIEW PHOTO GALLERY
ROADWAYS

East West Connector Road
Jacksonville Transportation Authority | Main St/Airport Center Dr, Duval County Project featuring 2-mile heavy civil roadway construction. Services included clearing, earthwork, basel, roadway curb, paving, stripe/sewage, storm drain, water main, electric, signalization, sound wall, landscape, and sidewalk services.

Waterfall Way
Twin Creek Development | CR 210, St. Johns County, FL Project featuring 1.58 miles of 4-lane divided highway. Services included turnkey site development, clearing, excavation and grading, paving, drainage, lift station, force main, water main, and reuse main.

Mayo Clinic
Mayo Clinic Jacksonville | San Pablo/JTB, Duval County Project featuring 2,500 ft private roadway construction. Services included clearing, earthwork, base, roadway, curb/gutter, storm, retaining wall, and sidewalk.
COMMERCIAL/INDUSTRIAL

U.S. Department of Homeland Security
Duke Realty Construction | Alta Dr, Duval County Project featuring GSA Coast Guard/ICE facility. Services included clear, demolition, earth, base, roadway, paving, stripe/sign, LS/FM, gravity sewer, water, and retaining wall.

NorthPort Logistics Center
The Conlan Company | New Berlin Rd, Duval County Project featuring 800,000 sf industrial building and associated parking. Services included turnkey site development, clearing, excavation and grading, paving, drainage, life station, force main, and water main.

General Electric Oil & Gas
The Conlan Company | Cecil Commerce Center-Normandy Blvd, Duval County Project featuring 600,000 sf of industrial/commercial building and associated parking. Services included turnkey site development, clearing, excavation and grading, paving, drainage, lift station, force main, and water main.

Port Jax Buildings 900-1000
Spinner Construction | Port Industrial Drive, Duval County Construction of a Commercial Site including Mobilization, Erosion Control, Demolition/Haul Off, SWPPP, Earthwork, Grading, Concrete Work (Curb & Sidewalk), Storm Drainage System, Testing, and As-builts

Silverleaf Market Parcel 23C
Skinner Bros. Realty Co. | Silverleaf Parkway, St. Johns County Construction of a Commercial/Retail Site including Mobilization, Sediment/Erosion Control, SWPPP, Earthwork, Pond Excavation, Stormwater Drainage System, Water Distribution System, Reclaimed Water Distribution System, Fire Distribution System, Gravity Sewer Collection System, Roadway/Parking Lot Construction, Striping, Testing, and As-builts
SUBDIVISION

Old Still
AV Homes | Baymeadows Rd, Duval County Project featuring 124 lot subdivision. Services included erosion control, clear, earth, roadway, paving, stripe/signage, storm, gravity sewer, retaining wall, and sidewalk.

Caroline Hills
Lennar Homes | Jane St, Duval County Project featuring 58 lot subdivision. Services included clearing, earthwork, paving, drainage, potable water, and sewage system.

Egrets Landing
D.R. Horton, Inc. | Sunbeam Rd., Duval County Project featuring a 63-lot subdivision. Services included clearing, earthwork, grading, paving, drainage, potable water, and sewage system.

Arbors Phases 1-6
Forestar | Hemlock Street, Duval County Construction of a Multi-Phase Subdivision including, Mobilization, Erosion Control, SWPPP, Clearing, Earthwork, Pond Excavation, Storm Drainage System, Lift Station, Force Main, Gravity Sewer Collection System, Water Distribution System, Roadway Construction, Striping/Signage, Sodding, Testing and As-builts.

Courtney Grove at Silverleaf, Parcel 8B
Hutson Companies | St. Johns Parkway, St. Johns County Construction of a Multi-Phase Subdivision including, Mobilization, Erosion Control, SWPPP, Clearing, Earthwork, Pond Excavation, Storm Drainage System, Lift Station, Force Main, Gravity Sewer Collection System, Water Distribution System, Reclaim Distribution System, Roadway Construction, Concrete Work (Curb & Sidewalk), Striping/Signage, Sodding, Testing and As-builts.

Silverleaf Reverie at Silverleaf, Parcel 22C
Hutson Companies | St. Johns Parkway, St. Johns County Construction of a Multi-Phase Subdivision including, Mobilization, Erosion Control, SWPPP, Clearing, Earthwork, Pond Excavation, Storm Drainage System, Lift Station, Force Main, Gravity Sewer Collection System, Water Distribution System, Reclaim Distribution System, Roadway Construction, Concrete Work (Curb & Sidewalk), Striping/Signage, Sodding, Testing and As-builts.

Trout River Development
Forestar | Trout River Blvd, Duval County Construction of a 110 unit Duplex Development including, Mobilization, Erosion Control, SWPPP, Clearing, Earthwork, Pond Excavation, Storm Drainage System, Lift Station, Force Main, Gravity Sewer Collection System, Water Distribution System, Roadway Construction, Concrete Work (Curb & Sidewalk), Striping/Signage, Sodding, Testing and As-builts.

Bartram Ranch Phases 1-6
Toll Brothers | Bartram Ranch Blvd, St. Johns County Construction of a Multi-Phase Subdivision including, Mobilization, Erosion Control, SWPPP, Clearing, Earthwork, Pond Excavation, Storm Drainage System, Lift Station, Force Main, Gravity Sewer Collection System, Water Distribution System, Reclaim Distribution System, Roadway Construction, Concrete Work (Curb & Sidewalk), Striping/Signage, Sodding, Testing and As-builts.

Hansen Creek
D R Horton | Hemlock Street, Duval County Construction of a 144 lot Duplex Development including, Mobilization, Erosion Control, SWPPP, Earthwork, Storm Drainage System, Lift Station, Force Main, Gravity Sewer Collection System, Water Distribution System, Roadway Construction, Striping/Signage, Sodding, Testing and As-builts.

103rd Residential
Dream Finders Homes | Arrow Lane, Duval County Construction of a 160 unit Townhome Development including, Mobilization, Erosion Control, Clearing, Demolition, Earthwork, Grading, Lift Station, Force Main, Gravity Sewer Collection System, Water Distribution System, Roadway Construction, Concrete Work (Curb & Sidewalk), Striping/Signage, Sodding, Testing and As-builts.
UTILITIES

Alta Lakes Commerce Center
The Conlan Company | Blasius Rd, Duval County Project featuring an industrial complex with 8,000 linear ft of concrete piping and more than 60 concrete structures. Services included turnkey site development, clearing, excavation and grading, paving, drainage, lift station, force main, and water main.

JEA Easement
Toll Brothers, Inc. | JEA Project featuring utility construction - installed 6,000 linear ft of 4" force main. Services included a lift station, a temporary force main, a force main, a water main, and a reuse main constructed along the right of way, with Toll Brothers (owner) and JEA sharing costs.

Coastal Oaks
Toll Brothers, Inc. | Nocatee, St. Johns County Project featuring infrastructure/access road to 37 lots in units 1, 4, and 7. Services included turnkey site development, clearing, excavation and grading, paving, drainage, box culverts, water main, and reuse main.